Two numbers decide most kitchen projects, and the cabinet refinishing process gives up neither. Price is the first. Time is the second. Time also changes how a family lives, because a kitchen isn’t a spare bedroom you can shut the door on. So here is the question I hear most: how long does cabinet refinishing take? I am Archie Deese, and I have refinished kitchens across Buckhead, Brookhaven, and Sandy Springs for 25 years. I would rather hand you a calendar than a vague range. This post walks through our two-phase cabinet refinishing process, phase by phase.
How Long Does Cabinet Refinishing Take, Phase by Phase
Two phases. Here is what happens in each one, and where that leaves your kitchen.
| Phase | What We Do | What Your Kitchen Can Do |
|---|---|---|
| Before scheduling | Define, approve, and finalize the scope in writing | Normal use |
| Phase 1, off-site (starting about two weeks before installation) | Remove your doors, drawer fronts, shelving, and detachable panels and refinish them in our shop | Sink, counters, appliances, and open boxes all work. No painters in the house |
| Phase 2, on-site (2 to 3 days) | Refinish the boxes and fixed components, reinstall every piece, align it all | Work area. Plan meals elsewhere |
| Close-out | Inspection, walkthrough, touch-ups, sign-off | Back in service |
Look at Phase 1. Your house is empty of painters for those two weeks, and your sink still runs. Most crews spend that time spraying inside your kitchen behind plastic sheeting taped to your ceiling. Ours are in a shop across town.
Why the Cabinet Refinishing Process Cannot Be Rushed

A finish that feels dry is not a finish that is done. Coatings keep hardening for days after the surface stops feeling wet. A door reinstalled too early picks up dents from its own hinges. That is exactly why the doors leave your house about two weeks before installation, instead of going back up the same week they are sprayed. Curing happens on a rack in our shop, not in your kitchen.
Off-site refinishing is what buys back your kitchen, and it is what makes the finish worth paying for. It allows for three things you cannot get in a working kitchen:
The EPA notes that airborne compounds climb sharply during and right after coating work. Its remodeling guidance suggests finishing materials outside the living space whenever possible. We started doing that for finish quality, and the cleaner air in your house was a bonus. Doors sprayed flat in a controlled shop also lay down smoother than doors sprayed hanging in place.
We use Milesi coatings on every set.
What Phase 2 Looks Like at Your House
Once the curing process is complete, our team returns to finish the job on site. During this phase, we:
This phase typically requires 2 to 3 days, depending on project size and scope. Those are the days your kitchen is a work area.
What Your Family Actually Does
Two stretches to plan for, and they are very different from each other.
Your doors are in our shop for two weeks. The kitchen works. It just has open boxes. What clients tell me helps:
The 2 to 3 days of on-site work. This is the real disruption:
Who Should Wait on Cabinet Refinishing
Refinishing is not right for every kitchen, and I turn down work over this. Some honest reasons to wait:
None of this requires moving out. A kitchen without cabinet doors is inconvenient, not unusable.
What Moves the Timeline
I would be selling you something if I claimed the dates never move. They do move. This is why the scope of work has to be fully defined, approved, and finalized before we put you on the schedule. Changes after scheduling can affect both timeline and execution, so we confirm all project details in advance.
Here is what actually pushes a date:
None of that should surprise you on the last day of Phase 2. A written scope separates a schedule change from an argument. The Painting Contractors Association treats it the same way. Their published industry standards define what a properly finished surface looks like. They also say adjustments to price and completion time belong in the agreement, not over the phone.

How Every Project Closes Out
The last day is a process, not a handshake. Every project runs through the same structured quality assurance and close-out:
That sequence is the same on a 12-door kitchen and a 40-door kitchen.
Who Should Wait on Cabinet Refinishing
Refinishing isn’t right for every kitchen, and I turn down work for this reason. Some honest reasons to wait:
If any of those describe your kitchen, say so during the estimate. A contractor who talks you out of the wrong job is worth more than one who books it anyway. We will tell you which option fits your cabinets. Our cabinet refinishing and refacing options page lays out where each one makes sense.
Questions Worth Asking Any Cabinet Refinisher
Ask these before you sign. The answers tell you more than a portfolio does.
A contractor who answers all six in writing has already told you how the project will go. One who answers in generalities has told you something too.